|
Layout Plan GMR 98
|
|
Eastern Loggers Track Plan, as it appeared in GMR 98
Copyright 1998 Updates Since this plan was published, we have made changes. The interchange track has been extended into a 4 track through staging yard. The other end returns out on the Gun Powder Mill track. Additionally, the creek on the left side (in the plan) of the interchange section has been removed. The spur on the Leetonia, PA section has been extended to the right and connected to the interchange track. This forms a double ended siding for bark loading. A more up to date plan is to be posted.
|