| The Phillips yards sections were the first to
be built, but today, they are the least complete. The
sections feature HOn3 Shinohara track and turnouts. The
future calls for replacing the Shinohara track with Railway Engineering #8
turnouts and hand
laid track. The
Phillips engine house and machine shop complex will fill the
corner behind the station.
|
|

|
| The plywood seen in this image will be the
Rangeley River on the North side of Phillips. On the
prototype, a 208' covered bridge spanned the river. In
S-scale, that bridge would be over 3 feet long. The
plywood deck in the photo spans 2.5 feet (fairly close to the
prototype). When complete, the bridge will lift off the
off the deck for track cleaning.
|
|
|